The project of Promus Katowice Sp.z o.o. aimed to introduce automation to the material transport process in the manufacturing company. The main goal was to increase efficiency, reduce processing time, and minimize the risk of material damage.

Implementation details

Client

A leading manufacturer in the Polish market in the wood processing industry.

Project name

Raw board transport system

Product transported

Raw board

Implement time

6 months

Play Video

Problem analysis

The project of Promus Katowice Sp.z o.o. aimed to introduce automation to the material transport process in the manufacturing company. The main goal was to increase efficiency, reduce processing time, and minimize the risk of material damage.

Objectives

By minimizing the number of forklifts in operation, the company achieved increased safety for employees and production efficiency

The project also focused on creating a safe and worker-friendly environment, reducing the risk of collisions, and better space management.

Customer requirements

The next step after familiarizing ourselves with the goals set by the client was a detailed identification and analysis of their requirements. Based on this, we defined the following challenges that we had to meet.

Ensuring safety at the intersections of forklift and self-propelled vehicle routes was one of the main challenges.

The project required minimal space for system implementation, resulting in a solution that allowed forklifts to pass under high-storage racks.

The system had to be flexible and able to collaborate with both self-propelled and forklift vehicles, including pocket conveyors.

The necessity to store materials in the event of a failure of one of the vehicles was a crucial aspect of the project.

Applied solutions

This solution increased control over the movement inside the building.

The vehicles were equipped with safety scanners to protect pedestrians and avoid collisions with obstacles.

To ensure uninterrupted operation of our vehicles, an inductive power system was utilized.

Benefits of implementing the system

The solution led to significant cost savings associated with forklifts, directly impacting the efficient utilization of resources.

The project ensured optimal use of space.

The project guaranteed overall workplace safety.

Increase efficiency and reduce costs through modern automation.

Fill out the form, and we will get in touch with you. We offer a free audit of your production line.

Zwiększ efektywność i redukuj koszty dzięki nowoczesnej automatyzacji

Wypełnij formularz, a my skontaktujemy się z Tobą. Oferujemy darmowy audyt Twojej linii produkcyjnej.